Hello All,
I have set up my project group and used for post cost-hour, balance. I also set the line property of the WIP to captitalise cost. Even though I use balance, the ledger status is still profit and loss
The entry I want to pass is Debit: Deferred cost of sale which is an asset and Credit salaries.
How can I modify this class projpostempltrans to achieve that posting?